🏗️ SOP: SITE SUPERVISOR (Construction)
🎯 PURPOSE
To ensure daily site work runs correctly in terms of:
- ⏱️ Time (on schedule)
- 💰 Cost (no waste)
- 🏆 Quality (meet standard)
- ⚠️ Safety (no accident)
👉 Site Supervisor = eyes + control system on site
🧭 1. DAILY RESPONSIBILITIES
🌅 Morning (Before Work Start)
✅ Actions:
-
Check attendance of workers
-
Review today’s work plan
-
Inspect tools & materials
-
Confirm drawings / instructions
📌 Example:
“Today: slab rebar installation → zone B → 6 workers”
🔄 During Work
✅ Control:
-
Work follows drawing + method statement
-
Workers use correct materials
-
Work progress is on schedule
👀 Check:
- Dimensions
- Level / alignment
- Reinforcement spacing
🌇 End of Day
✅ Report:
- Daily progress (%)
- Problems / delays
- Material usage
- Workforce number
👉 Send via Telegram (your team system)
📋 2. QUALITY CONTROL (QC)
🎯 Goal:
Ensure work meets standard + drawing
✅ Checklist:
-
Check before casting concrete:
- Rebar spacing ✔
- Cover ✔
- Formwork alignment ✔
-
Check after work:
- Finishing quality
- Surface defects
📌 Rule:
👉 “No approval → No next step”
⚠️ 3. SAFETY CONTROL
🎯 Goal:
Zero accident
✅ Actions:
-
Check PPE:
- Helmet
- Gloves
- Safety shoes
-
Identify risks:
- Working at height
- Electrical hazards
- Excavation
📌 Rule:
👉 “Unsafe → Stop work immediately”
📦 4. MATERIAL CONTROL
🎯 Goal:
Avoid waste & shortage
✅ Actions:
- Check delivered materials
- Compare with BOQ
- Store properly
📌 Example:
- Cement → dry area
- Steel → above ground
👷 5. WORKFORCE MANAGEMENT
🎯 Goal:
Right people → right work
✅ Actions:
- Assign tasks clearly
- Monitor worker productivity
- Solve worker problems
📌 Example:
“2 workers for rebar, 3 for formwork”
📊 6. REPORTING SYSTEM
🎯 Daily Report Must Include:
- Work completed
- Work in progress
- Issues
- Photos
📌 Format:
- Text + Photo + Short explanation
🧠 7. COMMUNICATION
🎯 Goal:
No misunderstanding
✅ Rules:
- Speak clearly
- Confirm understanding
- Repeat key instructions
📌 Example:
“Spacing 150 mm — confirm?”
🔁 8. PROBLEM SOLVING
🎯 When problem happens:
✅ Steps:
- Stop work (if serious)
- Identify problem
- Inform Site Engineer / PM
- Suggest solution
- Follow instruction
📐 9. DRAWING CONTROL
🎯 Goal:
Build exactly as designed
✅ Actions:
-
Always use latest drawing
- Check revision
- Ask when unclear
📌 Rule:
👉 “Don’t guess — ask”
🏆 10. PERFORMANCE KPI
📊 Site Supervisor is measured by:
- Work quality
- Progress vs schedule
- Material waste
- Safety record
- Team control
⚡ SIMPLE DAILY SYSTEM (EASY TO REMEMBER)
👉 Use this:
PLAN → CHECK → CONTROL → REPORT
🎯 Final Advice (Important)
A good Site Supervisor is NOT just watching.
👉 He is:
- Leader 👷
- Controller 🎯
- Problem solver 🧠
- Communicator 🗣️
If you want next level, I can help you:
✅ Turn this into HTML Smart-Book (your blog style, no popup)
✅ Add Khmer version (for your workers)
✅ Create
Daily Checklist form (print or mobile use)
Just tell me 👍