FULL COMPANY SYSTEM: BOQ + PROCUREMENT + KPI (INTEGRATED SYSTEM)

 Got it—this is next-level system building for your company.

I will design a FULL INTEGRATED SYSTEM for you like a professional construction company.


🏗️ FULL COMPANY SYSTEM

BOQ + PROCUREMENT + KPI (INTEGRATED SYSTEM)

This is how big companies operate — everything is connected.


🔷 1. SYSTEM OVERVIEW (HOW EVERYTHING CONNECTS)

BOQ → Material Plan → Procurement → Site Usage → KPI → Control → Profit

Flow Explanation:

  1. BOQ = Plan everything (cost + quantity)
  2. Procurement = Buy materials based on BOQ
  3. Site Team = Use materials
  4. KPI System = Measure performance
  5. Management = Control cost, time, quality

👉 This is your Company Brain


🔷 2. BOQ SYSTEM (ESTIMATION + CONTROL)

🎯 Purpose:

  • Know project cost BEFORE construction
  • Control budget DURING construction

📋 BOQ STRUCTURE

Code Work Item Unit Qty Unit Price Total Supplier Remarks
01 Excavation 50 $10 $500 ABC -
02 Concrete 30 $120 $3600 XYZ -

🧠 BOQ RULES (IMPORTANT)

1. Always separate:

  • Material
  • Labor
  • Equipment

2. Add:

  • Waste factor (5–10%)
  • Transport cost
  • Hidden cost

🔥 BOQ CONTROL METHOD

During construction:

Planned Qty vs Actual Qty
Planned Cost vs Actual Cost

👉 If difference > 5% → PROBLEM


🔷 3. PROCUREMENT SYSTEM (BUYING SYSTEM)

🎯 Purpose:

  • Buy the RIGHT material
  • At the RIGHT time
  • At the BEST price

📋 PROCUREMENT FLOW

Site → MR → Office → RFQ → Compare → Approve → Purchase → Deliver → Check

📄 DOCUMENT SYSTEM

1. Material Request (MR)

Date Project Item Qty Urgency Requested by

2. Request for Quotation (RFQ)

Send to 3 suppliers minimum


3. Price Comparison Sheet

Supplier Price Delivery Quality Score

4. Purchase Order (PO)

Official buying document


5. Delivery Note (DN)

Check when materials arrive


🔥 PROCUREMENT RULES

  • ❌ Never buy without MR
  • ❌ Never buy from 1 supplier only
  • ❌ Never skip price comparison
  • ✅ Always approve before purchase
  • ✅ Always check quality on site

🔷 4. SITE MATERIAL CONTROL SYSTEM

📋 MATERIAL TRACKING

Item BOQ Qty Delivered Used Balance Loss

🔥 CONTROL RULE

Loss % = (Delivered - Used) / Delivered

👉 If loss > 3% → investigate


🔷 5. KPI SYSTEM (TEAM PERFORMANCE)

🎯 Purpose:

Measure your team like a professional company


📊 KPI DASHBOARD

1. COST KPI

KPI Formula Target
Cost Variance Actual - BOQ ≤ 5%
Material Waste Loss % ≤ 3%

2. TIME KPI

KPI Formula Target
Schedule Delay Planned vs Actual ≤ 5%
Task Completion % Complete ≥ 95%

3. QUALITY KPI

KPI Measure Target
Rework Rate % ≤ 2%
Inspection Pass % ≥ 95%

4. PROCUREMENT KPI

KPI Measure Target
On-Time Delivery % ≥ 95%
Price Saving vs Market ≥ 5%

5. TEAM KPI

Role KPI
Site Engineer Cost + Quality
Foreman Productivity
Procurement Price + Delivery
PM Overall Performance

🔷 6. DAILY CONTROL SYSTEM (MOST IMPORTANT)

📋 DAILY REPORT CONNECT KPI

Date Work Progress Material Used Issue Responsible

🔥 DAILY CONTROL LOGIC

Every day check:

  • Progress vs plan
  • Material vs BOQ
  • Cost vs budget
  • Problems

👉 This is how you CONTROL your company


🔷 7. MASTER CONTROL DASHBOARD (LIKE BIG COMPANY)

🎯 One Page Dashboard

You (Boss) only check:

  • 💰 Cost Status
  • ⏱ Time Status
  • 🧱 Material Status
  • 👷 Team Performance

🔴 TRAFFIC LIGHT SYSTEM

Status Meaning
🟢 Green Good
🟡 Yellow Warning
🔴 Red Problem

🔷 8. FULL SYSTEM CONNECTION (IMPORTANT)

BOQ
 ↓
Procurement
 ↓
Material Control
 ↓
Daily Report
 ↓
KPI Dashboard
 ↓
Management Decision

👉 If one breaks → ALL FAIL


🔷 9. SIMPLE IMPLEMENTATION PLAN (FOR YOU)

Week 1:

  • Build BOQ template
  • Build MR + PO form

Week 2:

  • Train team
  • Start using on 1 project

Week 3:

  • Add KPI tracking

Week 4:

  • Build dashboard

🔥 FINAL STRATEGY (VERY IMPORTANT)

You are not just contractor anymore.

You are building:

🏢 SYSTEM-DRIVEN COMPANY


💡 RULE OF SUCCESS

  • Small company = people depend
  • Big company = system depend

👉 You must move to SYSTEM


🚀 NEXT STEP (I RECOMMEND)

I can build for you:

1. ✅ Excel / Google Sheet SYSTEM (auto calculate)

2. ✅ Mobile Forms (MR / Daily Report)

3. ✅ HTML Smart-Book (for your blog)

4. ✅ Full Dashboard (like professional company)


👉 Tell me:

“Build full system in Excel + Mobile + Dashboard”

I will create everything step-by-step for your real company.

Previous Post Next Post
📑