MEETING
MINUTE
| 
   Meeting No.  | 
  
   :  | 
  
   LCL-05-TE
  (TECNICAL-PH2) - MOM-00-0001  | 
 
| 
   Date  | 
  
   :  | 
  
   17 June 2020  | 
 
| 
   Time   | 
  
   :   | 
  
   02:30   03:30  | 
 
| 
   Venue  | 
  
   :  | 
  
   The EDGE LCL Site
  Office Phase 2  | 
 
| 
   Attendees   | 
  
   :  | 
  
   | 
 
| 
   S /n  | 
  
   Name   | 
  
   Designation   | 
  
   Company  | 
  
   E-mail  | 
 
| 
   1  | 
  
   Mr. Elamaren KOTTOYAN  | 
  
   Deputy Head, PMC  | 
  
   LIFESTYLE CREATION
  LIMITED (LCL)  | 
  
   theedge@ppcc.com.kh  | 
 
| 
   2  | 
  
   Mr. Sorn SOKLENG  | 
  
   Assistance Project
  Manager  | 
  
   LIFESTYLE CREATION
  LIMITED (LCL)  | 
  
   theedge@ppcc.com.kh  | 
 
| 
   3  | 
  
   Mrs. Myla  | 
  
   Architect  | 
  
   LIFESTYLE CREATION
  LIMITED (LCL)  | 
  
   theedge@ppcc.com.kh  | 
 
| 
   4  | 
  
   Mr. Chan MA  | 
  
   Mechanical Engineer  | 
  
   LIFESTYLE CREATION
  LIMITED (LCL)  | 
  
   theedge@ppcc.com.kh  | 
 
| 
   5  | 
  
   Mr. MA Soxrady  | 
  
   Project Engineer, MEP  | 
  
   LIFESTYLE CREATION
  LIMITED (LCL)  | 
  
   theedge@ppcc.com.kh  | 
 
| 
   6  | 
  
   Mr. Mok Socheath  | 
  
   M.E  | 
  
   LIFESTYLE CREATION
  LIMITED (LCL)  | 
  
   theedge@ppcc.com.kh  | 
 
| 
   7  | 
  
   Mr. Thy Likea  | 
  
   P.E  | 
  
   LIFESTYLE CREATION
  LIMITED (LCL)  | 
  
   theedge@ppcc.com.kh  | 
 
| 
   8  | 
  
   Mr. Wan Shah  | 
  
   Q.S  | 
  
   LIFESTYLE CREATION
  LIMITED (LCL)  | 
  
   theedge@ppcc.com.kh  | 
 
| 
   9  | 
  
   Mr. Sophal TAN  | 
  
   Project Manager  | 
  
   SG COMPLEX  | 
  
   sophal@sggroups.asia  | 
 
| 
   10  | 
  
   Mr. Irvin CATADA  | 
  
   Project Manager  | 
  
   URBAN ARCHITECTURE
  (URA)  | 
  
   iray@cts-group.asia  | 
 
| 
   11  | 
  
   Mr. La Seyha  | 
  
   S.C  | 
  
   URBAN ARCHITECTURE
  (URA)  | 
  
   | 
 
| 
   12  | 
  
   Mr. Sambath Chanborith  | 
  
   S.C  | 
  
   URBAN ARCHITECTURE
  (URA)  | 
  
   | 
 
| 
   13  | 
  
   Mr. Nob Kimleng   | 
  
   Designer  | 
  
   URBAN ARCHITECTURE
  (URA)  | 
  
   | 
 
| 
   14  | 
  
   Mr. Im Makara  | 
  
   C.M  | 
  
   URBAN ARCHITECTURE
  (URA)  | 
  
   | 
 
| 
   15  | 
  
   Mr. Sak Borey  | 
  
   C.M  | 
  
   TECHNO DESIGN AND
  CONTRUCTION  | 
  |
| 
   16  | 
  
   Mr. Chheang Sarim  | 
  
   C.M  | 
  
   TECHNO DESIGN AND
  CONTRUCTION  | 
  |
| 
   | 
  
   | 
  
   | 
  
   | 
  
   | 
 
| 
   | 
  
   | 
  
   | 
  
   | 
  
   | 
 
| 
   | 
  
   | 
  
   | 
  
   | 
  
   | 
 
| 
   | 
  
   | 
  
   | 
  
   | 
  
   | 
 
| 
   SN  | 
  
   ITEM  | 
  
   DATE  | 
  
   ACTION BY  | 
  
  | 
 
| 
   Progress Meeting: 02:30-03:30, LCL SITE
  OFFICE  | 
 ||||
| 
   1  | 
  
   a-     
  Drip
  mould to be applied under moulding b-    
  All
  door and window moulding must have a slope above and drip below moulding  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   2  | 
  
   a-     
  Exterior
  texture paint, LCL approved on supplier (Smart Paint). All contractor to
  check and coordinate with supplier directly  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   3  | 
  
   a-     
  For
  block wall inspection form are required 1 floor per form only         
  Exterior
  wall for 1 form         
  Interior
  wall for 1 form         
  Toilet
  wall for 1 form  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   4  | 
  
   a-     
  MEP
  to be installed and checked before plastering work  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   5  | 
  
   a-     
  Ceiling
  moisture resistance gypsum board 9mm use in toilet ceiling b-    
  Ceiling
  moisture resistance gypsum board 12mm use in common area ceiling  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   6  | 
  
   a-     
  Dulux
  paint to be applied for all internal wall  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   7  | 
  
   a-     
  LCL
  highlighted that if any contractor has
  any concern or misunderstanding about drawing, Contractor to send an RFI
  (request for information) or queries to LCL to check and feedback officially         
  Door
  and window opening dimensions         
  Groove
  line for exterior wall         
  Etc   | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   8  | 
  
   a-     
  LCL
  highlighted that for an opening of door and window allowance, its up to
  contractor to check and mark  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   9  | 
  
   a-     
  Contractor
  to provide centre line dimension of door and window opening location for LCL inspect
  on site. In which case that contractor don t have centre line dimension in
  shop drawing or on site for LCL inspect, Contractor to check and mark
  location by themselves and take responsible if there is an error  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   10  | 
  
   a-     
  For
  height of door and window from FFL, all contractor to follow door and window
  schedule latest approved construction drawing that issued by LCL  | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
| 
   11  | 
  
   a-     
  For
  the kitchen provision, the contractor provides the sleeve pipe for future
  installation   | 
  
   17.06.2020  | 
  
   | 
  
  | 
 
Next Meeting                : N/A                            
Minuted by                   :
Rothnak SARY           
Check by                      : MYLA/ Sorn SOKLENG         
Reviewed by                 : Elamaren
KOTTOYAN