MEETING
MINUTE
|
Meeting No. |
: |
LCL-05-TE
(TECNICAL-PH2) - MOM-00-0001 |
|
Date |
: |
17 June 2020 |
|
Time |
: |
02:30 03:30 |
|
Venue |
: |
The EDGE LCL Site
Office Phase 2 |
|
Attendees |
: |
|
|
S /n |
Name |
Designation |
Company |
E-mail |
|
1 |
Mr. Elamaren KOTTOYAN |
Deputy Head, PMC |
LIFESTYLE CREATION
LIMITED (LCL) |
theedge@ppcc.com.kh |
|
2 |
Mr. Sorn SOKLENG |
Assistance Project
Manager |
LIFESTYLE CREATION
LIMITED (LCL) |
theedge@ppcc.com.kh |
|
3 |
Mrs. Myla |
Architect |
LIFESTYLE CREATION
LIMITED (LCL) |
theedge@ppcc.com.kh |
|
4 |
Mr. Chan MA |
Mechanical Engineer |
LIFESTYLE CREATION
LIMITED (LCL) |
theedge@ppcc.com.kh |
|
5 |
Mr. MA Soxrady |
Project Engineer, MEP |
LIFESTYLE CREATION
LIMITED (LCL) |
theedge@ppcc.com.kh |
|
6 |
Mr. Mok Socheath |
M.E |
LIFESTYLE CREATION
LIMITED (LCL) |
theedge@ppcc.com.kh |
|
7 |
Mr. Thy Likea |
P.E |
LIFESTYLE CREATION
LIMITED (LCL) |
theedge@ppcc.com.kh |
|
8 |
Mr. Wan Shah |
Q.S |
LIFESTYLE CREATION
LIMITED (LCL) |
theedge@ppcc.com.kh |
|
9 |
Mr. Sophal TAN |
Project Manager |
SG COMPLEX |
sophal@sggroups.asia |
|
10 |
Mr. Irvin CATADA |
Project Manager |
URBAN ARCHITECTURE
(URA) |
iray@cts-group.asia |
|
11 |
Mr. La Seyha |
S.C |
URBAN ARCHITECTURE
(URA) |
|
|
12 |
Mr. Sambath Chanborith |
S.C |
URBAN ARCHITECTURE
(URA) |
|
|
13 |
Mr. Nob Kimleng |
Designer |
URBAN ARCHITECTURE
(URA) |
|
|
14 |
Mr. Im Makara |
C.M |
URBAN ARCHITECTURE
(URA) |
|
|
15 |
Mr. Sak Borey |
C.M |
TECHNO DESIGN AND
CONTRUCTION |
|
|
16 |
Mr. Chheang Sarim |
C.M |
TECHNO DESIGN AND
CONTRUCTION |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SN |
ITEM |
DATE |
ACTION BY |
|
|
Progress Meeting: 02:30-03:30, LCL SITE
OFFICE |
||||
|
1 |
a-
Drip
mould to be applied under moulding b-
All
door and window moulding must have a slope above and drip below moulding |
17.06.2020 |
|
|
|
2 |
a-
Exterior
texture paint, LCL approved on supplier (Smart Paint). All contractor to
check and coordinate with supplier directly |
17.06.2020 |
|
|
|
3 |
a-
For
block wall inspection form are required 1 floor per form only
Exterior
wall for 1 form
Interior
wall for 1 form
Toilet
wall for 1 form |
17.06.2020 |
|
|
|
4 |
a-
MEP
to be installed and checked before plastering work |
17.06.2020 |
|
|
|
5 |
a-
Ceiling
moisture resistance gypsum board 9mm use in toilet ceiling b-
Ceiling
moisture resistance gypsum board 12mm use in common area ceiling |
17.06.2020 |
|
|
|
6 |
a-
Dulux
paint to be applied for all internal wall |
17.06.2020 |
|
|
|
7 |
a-
LCL
highlighted that if any contractor has
any concern or misunderstanding about drawing, Contractor to send an RFI
(request for information) or queries to LCL to check and feedback officially
Door
and window opening dimensions
Groove
line for exterior wall
Etc |
17.06.2020 |
|
|
|
8 |
a-
LCL
highlighted that for an opening of door and window allowance, its up to
contractor to check and mark |
17.06.2020 |
|
|
|
9 |
a-
Contractor
to provide centre line dimension of door and window opening location for LCL inspect
on site. In which case that contractor don t have centre line dimension in
shop drawing or on site for LCL inspect, Contractor to check and mark
location by themselves and take responsible if there is an error |
17.06.2020 |
|
|
|
10 |
a-
For
height of door and window from FFL, all contractor to follow door and window
schedule latest approved construction drawing that issued by LCL |
17.06.2020 |
|
|
|
11 |
a-
For
the kitchen provision, the contractor provides the sleeve pipe for future
installation |
17.06.2020 |
|
|
Next Meeting : N/A
Minuted by :
Rothnak SARY
Check by : MYLA/ Sorn SOKLENG
Reviewed by : Elamaren