MEETING MINUTE _ 02. 20200617_LCL-05-TE(MW-PH2)-MOM-20-0004

MEETING MINUTE

 

 

 

Meeting No.

:

LCL-05-TE (TECNICAL-PH2) - MOM-00-0001

Date

:

17 June 2020

Time

:

02:30 03:30

Venue

:

The EDGE LCL Site Office Phase 2

 

Attendees

:

 

 

S /n

Name

Designation

Company

E-mail

 

1

Mr. Elamaren KOTTOYAN

Deputy Head, PMC

LIFESTYLE CREATION LIMITED (LCL)

theedge@ppcc.com.kh

2

Mr. Sorn SOKLENG

Assistance Project Manager

LIFESTYLE CREATION LIMITED (LCL)

theedge@ppcc.com.kh

3

Mrs. Myla

Architect

LIFESTYLE CREATION LIMITED (LCL)

theedge@ppcc.com.kh

4

Mr. Chan MA

Mechanical Engineer

LIFESTYLE CREATION LIMITED (LCL)

theedge@ppcc.com.kh

5

Mr. MA Soxrady

Project Engineer, MEP

LIFESTYLE CREATION LIMITED (LCL)

theedge@ppcc.com.kh

6

Mr. Mok Socheath

M.E

LIFESTYLE CREATION LIMITED (LCL)

theedge@ppcc.com.kh

7

Mr. Thy Likea

P.E

LIFESTYLE CREATION LIMITED (LCL)

theedge@ppcc.com.kh

8

Mr. Wan Shah

Q.S

LIFESTYLE CREATION LIMITED (LCL)

theedge@ppcc.com.kh

9

Mr. Sophal TAN

Project Manager

SG COMPLEX

sophal@sggroups.asia

10

Mr. Irvin CATADA

Project Manager

URBAN ARCHITECTURE (URA)

iray@cts-group.asia

11

Mr. La Seyha

S.C

URBAN ARCHITECTURE (URA)

 

12

Mr. Sambath Chanborith

S.C

URBAN ARCHITECTURE (URA)

 

13

Mr. Nob Kimleng

Designer

URBAN ARCHITECTURE (URA)

 

14

Mr. Im Makara

C.M

URBAN ARCHITECTURE (URA)

 

15

Mr. Sak Borey

C.M

TECHNO DESIGN AND CONTRUCTION

theedge.ksr@gmail.com 

16

Mr. Chheang Sarim

C.M

TECHNO DESIGN AND CONTRUCTION

theedge.ksr@gmail.com 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SN

ITEM

DATE

ACTION BY

 

Progress Meeting: 02:30-03:30, LCL SITE OFFICE

1

a-      Drip mould to be applied under moulding

b-     All door and window moulding must have a slope above and drip below moulding

17.06.2020

 

 

2

a-      Exterior texture paint, LCL approved on supplier (Smart Paint). All contractor to check and coordinate with supplier directly

17.06.2020

 

 

3

a-      For block wall inspection form are required 1 floor per form only

        Exterior wall for 1 form

        Interior wall for 1 form

        Toilet wall for 1 form

17.06.2020

 

 

4

a-      MEP to be installed and checked before plastering work

17.06.2020

 

 

5

a-      Ceiling moisture resistance gypsum board 9mm use in toilet ceiling

b-     Ceiling moisture resistance gypsum board 12mm use in common area ceiling

17.06.2020

 

 

6

a-      Dulux paint to be applied for all internal wall

17.06.2020

 

 

7

a-      LCL highlighted that if any contractor has any concern or misunderstanding about drawing, Contractor to send an RFI (request for information) or queries to LCL to check and feedback officially

        Door and window opening dimensions

        Groove line for exterior wall

        Etc

17.06.2020

 

 

8

a-      LCL highlighted that for an opening of door and window allowance, its up to contractor to check and mark

17.06.2020

 

 

9

a-      Contractor to provide centre line dimension of door and window opening location for LCL inspect on site. In which case that contractor don t have centre line dimension in shop drawing or on site for LCL inspect, Contractor to check and mark location by themselves and take responsible if there is an error

17.06.2020

 

 

10

a-      For height of door and window from FFL, all contractor to follow door and window schedule latest approved construction drawing that issued by LCL

17.06.2020

 

 

11

a-      For the kitchen provision, the contractor provides the sleeve pipe for future installation

17.06.2020

 

 

 

Next Meeting : N/A