SOP: BILL OF QUANTITIES (BOQ)

Let’s build a professional SOP: BOQ (Bill of Quantities) for your construction company — clear, practical, and ready for real site use.


🏗️ SOP: BILL OF QUANTITIES (BOQ)

🎯 1. PURPOSE

To ensure accurate cost estimation, material control, and project budgeting for all construction projects.

👉 BOQ helps you:

  • Control Cost

  • Plan Procurement

  • Manage Construction Work

  • Avoid Loss / Over-budget


📌 2. SCOPE

This SOP applies to:

  • Residential buildings (your main projects)
  • Renovation works
  • Structural + Architectural + MEP works

👷 3. RESPONSIBLE TEAM

Role Responsibility
Project Manager Approve BOQ
QS (Quantity Surveyor) Prepare BOQ
Site Engineer Verify quantities
Procurement Team Use BOQ for purchasing
Director (You) Final control

🧱 4. BOQ STRUCTURE (STANDARD FORMAT)

📊 Main Sections:

  1. Preliminaries
  2. Earthwork
  3. Concrete Work
  4. Reinforcement (Rebar)
  5. Formwork
  6. Masonry
  7. Plastering
  8. Finishing (Tiles, Paint)
  9. Roofing
  10. Doors & Windows
  11. Electrical Work
  12. Plumbing Work

📋 Example BOQ Table

No Description Unit Quantity Unit Price Amount
1 Excavation 50 $8 $400
2 Concrete C25 30 $95 $2,850
3 Rebar DB16 kg 2,000 $1.2 $2,400

👉 Formula:

  • Amount = Quantity × Unit Price


🧮 5. STEP-BY-STEP PROCESS

🔹 Step 1: Review Drawings

  • Structural drawings
  • Architectural drawings
  • MEP drawings

👉 Goal: Understand full project scope


🔹 Step 2: Quantity Take-Off (QTO)

Calculate:

  • Concrete (m³)
  • Rebar (kg)
  • Formwork (m²)
  • Masonry (m² / m³)

👉 Use:

  • AutoCAD / Excel / Manual calculation

🔹 Step 3: Apply Unit Rates

  • Use market price (Cambodia local)
  • Update regularly

👉 Example:

  • Concrete = $90–100/m³
  • Rebar = $1.1–1.3/kg

🔹 Step 4: Prepare BOQ Sheet

Use Excel with:

  • Clear item codes
  • Grouped work sections
  • Summary page

🔹 Step 5: Verification

  • Site Engineer checks quantity
  • Compare with drawing
  • Check mistakes

🔹 Step 6: Approval

  • PM reviews
  • Director approves

🔹 Step 7: Issue BOQ

Used for:

  • Budget planning
  • Procurement
  • Client quotation

⚙️ 6. BOQ CONTROL SYSTEM (IMPORTANT)

✅ Rule 1: No Work Without BOQ

👉 Every activity must be in BOQ


✅ Rule 2: Variation Control

If change:

  • Add Variation Order (VO)
  • Update BOQ

✅ Rule 3: Site Tracking

  • Compare Planned vs Actual

  • Weekly check

✅ Rule 4: Material Control

  • BOQ = Purchase reference
  • Avoid over-order

📉 7. COMMON MISTAKES (AVOID THIS)

❌ Missing items (very dangerous)
❌ Wrong unit (m² vs m³)
❌ Not including waste (%)
❌ Using outdated prices
❌ No checking before approval


📈 8. PROFESSIONAL SYSTEM (UPGRADE LEVEL)

🔥 Level 1 (Basic)

  • BOQ in Excel

🔥 Level 2 (Professional)

  • BOQ + Cost Control System

🔥 Level 3 (Company Level)

  • BOQ linked with:

    • KPI system
    • Procurement
    • Site progress

👉 This is what big companies do.


🧠 9. SIMPLE WAY TO REMEMBER

👉 BOQ = WHAT + HOW MUCH + HOW MUCH MONEY

  • WHAT → Work item
  • HOW MUCH → Quantity
  • MONEY → Cost

🚀 FINAL ADVICE (FROM MR. T)

Sarim, if you master BOQ, you control:

  • 💰 Profit
  • 📦 Materials
  • ⏱️ Time

👉 No BOQ = Blind Construction
👉 Strong BOQ = Professional Company


If you want next level, I can help you:
✅ Turn this into HTML Smart-Book post (your blog style)
✅ Create Excel BOQ Template (auto calculation)
✅ Build BOQ + Procurement + KPI system (full company system)

Previous Post Next Post
📑