Sarim Insight • Smart-Book Post
Construction Abbreviations for Drawing, BOQ, and Site Work
A practical abbreviation guide for contractors, engineers, and site teams.
Purpose: This post helps you remember the most common construction abbreviations used in
drawings, BOQ, reports, and site communication.
1) Professions
Design & Engineering
- Arch. = Architect
- Ar. = Architect
- Eng. = Engineer
- Civ. Eng. = Civil Engineer
- Str. Eng. = Structural Engineer
Management
- PM = Project Manager
- CM = Construction Manager
- QS = Quantity Surveyor
- Cont. = Contractor
- Sub-Cont. = Subcontractor
Building Systems
- MEP Eng. = Mechanical, Electrical, Plumbing Engineer
- Elec. Eng. = Electrical Engineer
- Plumb. Eng. = Plumbing Engineer
2) Drawing Disciplines
| Abbreviation | Full Meaning | Common Use |
|---|---|---|
| Arch. Drg. | Architectural Drawing | Plan, elevation, section, detail |
| Str. Drg. | Structural Drawing | Beam, column, slab, footing drawings |
| MEP Drg. | Mechanical, Electrical, Plumbing Drawing | Services coordination |
| Elec. Drg. | Electrical Drawing | Lighting, power, panel layout |
| Plumb. Drg. | Plumbing Drawing | Water supply and drainage layout |
3) Structural Terms
Main Structural Elements
- Str. = Structure
- Struct. = Structure
- Col. = Column
- Bm. = Beam
- Slb. = Slab
- Fd. = Foundation
- Ft. = Footing
Concrete & Steel
- RC = Reinforced Concrete
- Rebar = Reinforcement Bar
- Conc. = Concrete
- Reinf. = Reinforcement
- Formwk. = Formwork
Technical Symbols
- Ø = Diameter
- c/c = Center to Center
- TYP. = Typical
- Lvl. = Level
- FFL = Finished Floor Level
- NGL = Natural Ground Level
4) MEP Terms
General Systems
- MEP = Mechanical, Electrical, Plumbing
- HVAC = Heating, Ventilation, Air Conditioning
Electrical
- DB = Distribution Board
- LT = Lighting
- PWR = Power
Plumbing
- SAN = Sanitary
- WS = Water Supply
5) Measurement Abbreviations
| Abbreviation | Meaning | Use Example |
|---|---|---|
| mm | millimeter | Ø12 mm rebar |
| cm | centimeter | Beam size 20 × 30 cm |
| m | meter | Wall length 5 m |
| m² | square meter | Floor area 120 m² |
| m³ | cubic meter | Concrete volume 15 m³ |
6) BOQ and Project Terms
BOQ Terms
- BOQ = Bill of Quantities
- Qty = Quantity
- Unit = Unit
- Rate = Price per unit
- Amt = Amount
- Spec. = Specification
Site Work Terms
- Exc. = Excavation
- Backf. = Backfilling
- Conc. = Concrete
- Formwk. = Formwork
- Reinf. = Reinforcement
7) Easy Memory Guide
- Str. = Structure
- RC = Reinforced Concrete
- BOQ = Quantity + Cost
- MEP = Building Systems
- FFL = Finished Floor Level
Example Site Sentence:
Check the Str. Drg. before casting the RC Slb.. Use Ø12 @200 c/c as per Spec.
Check the Str. Drg. before casting the RC Slb.. Use Ø12 @200 c/c as per Spec.
8) Final Note
These abbreviations are very useful for reading drawings, preparing BOQ, writing reports, and communicating with workers, engineers, and clients on site.
For daily construction work, learning these short forms will help you read faster, write faster, and communicate more professionally.
Tags: