Construction Abbreviations for Drawing, BOQ, and Site Work

Sarim Insight • Smart-Book Post

Construction Abbreviations for Drawing, BOQ, and Site Work

A practical abbreviation guide for contractors, engineers, and site teams.

Purpose: This post helps you remember the most common construction abbreviations used in drawings, BOQ, reports, and site communication.

1) Professions

Design & Engineering

  • Arch. = Architect
  • Ar. = Architect
  • Eng. = Engineer
  • Civ. Eng. = Civil Engineer
  • Str. Eng. = Structural Engineer

Management

  • PM = Project Manager
  • CM = Construction Manager
  • QS = Quantity Surveyor
  • Cont. = Contractor
  • Sub-Cont. = Subcontractor

Building Systems

  • MEP Eng. = Mechanical, Electrical, Plumbing Engineer
  • Elec. Eng. = Electrical Engineer
  • Plumb. Eng. = Plumbing Engineer

2) Drawing Disciplines

Abbreviation Full Meaning Common Use
Arch. Drg. Architectural Drawing Plan, elevation, section, detail
Str. Drg. Structural Drawing Beam, column, slab, footing drawings
MEP Drg. Mechanical, Electrical, Plumbing Drawing Services coordination
Elec. Drg. Electrical Drawing Lighting, power, panel layout
Plumb. Drg. Plumbing Drawing Water supply and drainage layout

3) Structural Terms

Main Structural Elements

  • Str. = Structure
  • Struct. = Structure
  • Col. = Column
  • Bm. = Beam
  • Slb. = Slab
  • Fd. = Foundation
  • Ft. = Footing

Concrete & Steel

  • RC = Reinforced Concrete
  • Rebar = Reinforcement Bar
  • Conc. = Concrete
  • Reinf. = Reinforcement
  • Formwk. = Formwork

Technical Symbols

  • Ø = Diameter
  • c/c = Center to Center
  • TYP. = Typical
  • Lvl. = Level
  • FFL = Finished Floor Level
  • NGL = Natural Ground Level

4) MEP Terms

General Systems

  • MEP = Mechanical, Electrical, Plumbing
  • HVAC = Heating, Ventilation, Air Conditioning

Electrical

  • DB = Distribution Board
  • LT = Lighting
  • PWR = Power

Plumbing

  • SAN = Sanitary
  • WS = Water Supply

5) Measurement Abbreviations

Abbreviation Meaning Use Example
mm millimeter Ø12 mm rebar
cm centimeter Beam size 20 × 30 cm
m meter Wall length 5 m
square meter Floor area 120 m²
cubic meter Concrete volume 15 m³

6) BOQ and Project Terms

BOQ Terms

  • BOQ = Bill of Quantities
  • Qty = Quantity
  • Unit = Unit
  • Rate = Price per unit
  • Amt = Amount
  • Spec. = Specification

Site Work Terms

  • Exc. = Excavation
  • Backf. = Backfilling
  • Conc. = Concrete
  • Formwk. = Formwork
  • Reinf. = Reinforcement

7) Easy Memory Guide

  • Str. = Structure
  • RC = Reinforced Concrete
  • BOQ = Quantity + Cost
  • MEP = Building Systems
  • FFL = Finished Floor Level
Example Site Sentence:
Check the Str. Drg. before casting the RC Slb.. Use Ø12 @200 c/c as per Spec.

8) Final Note

These abbreviations are very useful for reading drawings, preparing BOQ, writing reports, and communicating with workers, engineers, and clients on site.

For daily construction work, learning these short forms will help you read faster, write faster, and communicate more professionally.