🛠 Cutting Optimizer — Bars / Pipes
Tip: The Material column is optional. Empty = a separate material bucket called “(No material)”.
🏷️ Project name:
This will appear in Export PNG (A4 per material) + JSON export.
📋 Paste from Excel (Tab-separated)
Copy rows in Excel → paste here. Supports headers or no headers.
Cut List example: Material | Cut length | Quantity (or Cut length | Quantity).
Stock example: Material | Stock length | Quantity (or Stock length | Quantity).
Auto unit: if length looks like mm (e.g., 1200), it converts to meters (1.2).
Cut List example: Material | Cut length | Quantity (or Cut length | Quantity).
Stock example: Material | Stock length | Quantity (or Stock length | Quantity).
Auto unit: if length looks like mm (e.g., 1200), it converts to meters (1.2).
Stock Types
| Material | Stock length (m) | Quantity on hand | |
|---|---|---|---|
Cut List
| Material | Cut length (m) | Quantity | |
|---|---|---|---|
📊 Results
Tags:
Order Material