SOP: Structural Shop Drawing Workflow (RC Building)

Smart-Book • SOP
SOP: Structural Shop Drawing Workflow (RC Building)

SOP នេះជួយឲ្យក្រុម Engineer/Detailer/Site ធ្វើ Shop Drawing បានត្រឹមត្រូវ សាងសង់បានពិត និងកាត់បន្ថយ Error / Rework / Delay។

🎯 គោលបំណង (Purpose)

ត្រឹមត្រូវតាម DesignNo change to design intent
សាងសង់បានពិតនៅ SiteBuildable without guessing
កាត់បន្ថយ ReworkLess errors, less delay
ការត្រួតពិនិត្យច្បាស់Clear review & approval

🧩 Workflow Overview

Design & Analysis → Shop Drawing → Review → Approval → Construction
Shop Drawing = Detail/Working drawing សម្រាប់សាងសង់ និង fabrication (BBS/Formwork)។

📌 ដំណាក់កាល SOP (Step-by-step)

1️⃣ Input Preparation (Engineer in Charge)

ឯកសារដែលត្រូវមាន (Inputs)

  • ✅ Structural Design Drawing (Approved / Latest revision)
  • ✅ Calculation summary (Moment/Shear/Rebar concept)
  • ✅ Architectural drawings (Latest)
  • ✅ MEP layout (openings, sleeves, embeds)
  • ✅ Design codes / specs (ACI / BS / Eurocode ឬ Spec គម្រោង)
Rule: Shop Drawing មិនត្រូវផ្លាស់ប្តូរ Design intent (បើត្រូវប្ដូរ → RFI/Design change request)។
2️⃣ Shop Drawing Production (Detailer / Engineer)

ត្រូវបង្ហាញលម្អិត (Must show)

  • Beam / Column / Slab rebar layout (Top/Bottom/Extra bars)
  • Bar size, spacing, layer & direction
  • Lap splice / Anchorage length / Development (per code/spec)
  • Hook / Bend detail (shape, angle, length)
  • Concrete cover (slab/beam/column/footing per requirement)
  • Section & elevation (cut view) + dimension & level
  • Openings, embeds, inserts, starter bars / dowels
  • Clash check with Architecture/MEP (សំខាន់ណាស់)

Outputs

  • 🧱 Rebar Shop Drawings (AFC-ready)
  • 📋 Bar Bending Schedule (BBS) / Cutting list
  • 📐 Formwork layout (បើគម្រោងត្រូវការ)
Golden rule: Drawing = Site អាចសាងសង់បាន ដោយមិនចាំបាច់សួរច្រើន
3️⃣ Internal Check (Checker / Senior Engineer)

Checklist ត្រួតពិនិត្យ (Internal QA/QC)

  • ☐ Rebar qty/sizes សមស្របជាមួយ design requirement
  • ☐ Lap/anchorage length ត្រឹម code/spec
  • ☐ Clear spacing OK (មិនអោយកកស្ទះដែក / congested)
  • ☐ Cover correct (យោងតាម spec/standard)
  • ☐ No clash with openings/MEP/architecture
  • ☐ Dimensions readable, consistent units (mm), sections clear
  • ☐ Notes, bar marks, and references complete
ក្បួនសំខាន់: “No check = No submission” (មិន check មិនអោយ submit)។
4️⃣ Submission & Approval (Consultant/Client)

Submit ទៅ

  • Consultant / Client / Engineer of Record (EOR)

Status (ស្ថានភាព)

  • 🟡 Revise & Resubmit (ត្រូវកែ)
  • 🟢 Approved for Construction (AFC) (អនុម័តសាងសង់)
Rule: Site គួរសាងសង់តែ Drawing ដែលជា AFC ប៉ុណ្ណោះ។
5️⃣ Site Execution Control (Site Engineer)

Before pouring concrete (Pre-pour check)

  • ☐ Rebar matches shop drawing (size/qty/position)
  • ☐ Spacing & layer correct (chairs/support installed)
  • ☐ Cover block installed (correct thickness)
  • ☐ Openings/sleeves/embeds correct and fixed
  • ☐ Rebar clean, tied well, no loose bars
  • ☐ Photos + inspection record (QC evidence)
Rule: បើ mismatch → Stop work → Clarify (RFI/Engineer) → Correct → Re-check។

🧠 Responsibility Matrix

Structural EngineerDesign intent & technical approval
DetailerShop drawing accuracy & completeness
CheckerQA/QC (error prevention)
Site EngineerExecution & compliance on site

❗ Common Mistakes to Avoid

  • ❌ Copy design drawing as shop drawing (ខ្វះ lap/hook/section/detail)
  • ❌ Missing lap / anchorage / hook detail
  • ❌ No section cut (site មិនយល់ layer)
  • ❌ Rebar congested (ដាក់មិនចូលពេលចាក់បេតុង)
  • ❌ Build without AFC drawings
Rule សម្រាប់ក្រុមអ្នក:
Design = What is required
Shop Drawing = How to build it
Site = Build exactly as approved

🧭 មាតិកា (TOC)

✅ Quick Site Checklist (Pre-Pour)

  • Rebar size/qty/position ត្រូវតាម AFC
  • Spacing & layers correct (chairs/support OK)
  • Cover blocks installed (correct thickness)
  • Openings/embeds/sleeves fixed & checked
  • Photos + QC record before pour
Tip: បោះពុម្ព Checklist នេះដាក់ក្នុង Telegram group ក្រុមការងារ (QC) ដើម្បីអោយ check ងាយ។