SOP — Construction Team Workflow System

✎ Edit
↓ Quick Down

🧠 🏗️ SOP — Construction Team Workflow System

Core Idea: Every project must follow a system — not random work


🎯 1. OVERALL WORKFLOW

Flow:

Lead → Contract → Planning → Execution → Monitoring → Handover → Maintenance


🧱 2. PRE-CONSTRUCTION WORKFLOW

Step 01 — Client Confirmation
  • Confirm project scope (size, floors, design)
  • Confirm budget
  • Confirm timeline
Step 02 — Site Inspection
  • Measure land
  • Check access road
  • Check soil condition
Step 03 — Documentation
  • Drawings (Arch + Structural)
  • BOQ
  • Contract agreement
Step 04 — Team Setup
  • Assign Project Manager
  • Assign Site Engineer
  • Assign Foreman
  • Assign Workers

⚙️ 3. PLANNING WORKFLOW

Step 01 — Schedule
  • Create timeline (Gantt / MS Project)
  • Define milestones (Foundation, Structure, Finishing)
Step 02 — Material Plan
  • List materials per phase
  • Plan delivery schedule
Step 03 — Method Statement
  • Define work methods (beam, slab, column)
  • Include safety procedure

🚧 4. EXECUTION WORKFLOW

Daily Workflow:

  • Morning: Toolbox meeting + assign tasks
  • During Work: Follow drawings + engineer check
  • End of Day: Report + photos + issues

👷 5. QA/QC WORKFLOW

Before Work
  • Check drawings
  • Check materials
During Work
  • Check rebar spacing
  • Check formwork
  • Check alignment
After Work
  • Inspection checklist
  • Approval before next step

📊 6. MONITORING & CONTROL

Daily Report
  • Work completed
  • Labor count
  • Issues
Weekly Report
  • Progress %
  • Compare with plan
Cost Control
  • Material cost tracking
  • Labor cost tracking

🔄 7. COMMUNICATION

  • Internal: Telegram group (daily update)
  • External: Weekly client report
  • Use RFI for unclear issues

📩 8. RFI WORKFLOW

  1. Identify problem
  2. Write clear RFI
  3. Send to engineer/architect
  4. Wait for reply
  5. Record answer

🏁 9. HANDOVER

  • Final inspection
  • Fix all defects
  • Provide as-built drawings
  • Client walkthrough

🔧 10. MAINTENANCE

  • Follow up client
  • Fix defects during warranty

📊 TEAM STRUCTURE

RoleResponsibility
Project ManagerOverall control
Site EngineerTechnical control
ForemanDaily control
WorkersExecute work

⚡ GOLDEN RULES

No drawing = No work

No checking = No concrete

No report = No control

No system = No growth


🧠 FINAL MINDSET

Small contractor = works hard
Smart contractor = builds system

“You don’t grow by working more — you grow by controlling workflow.”