KPIs for 8AM Contractor (Construction‑Focused)

KPIs (Key Performance Indicators) for 8AM Contractor

Key Performance Indicators (KPIs) are measurable values that help 8AM Contractor track progress toward important construction goals — like efficiency, safety, cost control, and quality.

🏗 Construction‑Specific KPI Examples

CategoryKPI NameFormula / MeasurementTarget Example
ScheduleProject On‑Time Completion(Completed Tasks ÷ Planned Tasks) × 100≥ 95% weekly
ProductivityLabor ProductivityTotal Output ÷ Total Labor Hours≥ 1.2 units/hour
Material EfficiencyRebar Waste Rate(Waste Length ÷ Total Used Length) × 100≤ 2%
Material EfficiencyPlaster Yield Accuracy(Actual Coverage ÷ Estimated Coverage) × 10095%–105%
CostBudget Variance(Actual Cost − Planned Cost) ÷ Planned Cost × 100≤ ±5%
SafetySafety Incident Rate(Incidents ÷ Total Work Hours) × 200,0000 incidents
QualityRework Ratio(Rework Hours ÷ Total Hours) × 100≤ 3%
ClientClient SatisfactionAverage Rating (1–5)≥ 4.5/5
ProcurementMaterial Delivery On‑Time(Deliveries On‑Time ÷ Total Deliveries) × 100≥ 90%
FinanceCash Flow Stability(Inflows − Outflows) ÷ Outflows × 100Positive monthly

⚙ How to Apply KPIs in 8AM Contractor

  1. Define goal → Example: “Finish every project phase on schedule.”
  2. Select KPI → Use On‑Time Completion %.
  3. Set target → ≥ 95% tasks on schedule.
  4. Measure weekly → From your task tracker or site log.
  5. Review monthly → Discuss with site team and improve.

📋 KPI Template Example

KPI NameRebar Waste Rate
GoalReduce steel waste in column reinforcement
Formula(Waste Length ÷ Total Used Length) × 100
Baseline4%
Target≤ 2%
OwnerSite Supervisor
FrequencyWeekly
Data SourceCutting Optimizer Report (8AM Plugin)

🧠 English Word List (Construction Context)

WordMeaningExample Sentence
EfficiencyDoing work with minimum wasteWe check efficiency by tracking rebar usage.
VarianceThe difference between actual and planned valuesThe project variance is only 3%.
ProductivityAmount of work done per timeLabor productivity increased this week.
ReworkWork done again to fix mistakesWe reduced rework by improving supervision.
BaselineStarting point to compare resultsOur baseline waste rate was 4%.
IndicatorA measurable sign of performanceSafety record is a key indicator for our team.

💡 Tips for Team Tracking

  • Keep 3–5 KPIs per site: schedule, safety, material, cost, and quality.
  • Use Telegram group to share KPI progress photos or numbers every Friday.
  • Include monthly report summary in your blog (Sarim Insight KPI Tracker).
  • Show trend charts (green for improvement, red for delay).

✅ This version is built for 8AM Contractor — to measure construction progress, safety, cost, and productivity effectively each week.